Experience
To
provide project managers with the necessary tools to organize project
resources and staff functions to produce quality products on time and under
budget.
December 2011 to January 2013, CJ Design
Concepts, LLC
Sr. Scheduler – (Urenco,
Hobbs, NM)
- Create and maintain Integrated
Master Schedule on P6 for Nuclear Enrichment Facility
- Provide management with Two
week look ahead
- Assist in guidance to
establishing Work Breakdown Structure
- Monitor projects within the IMS
for identification of projects / activities that are not performing
within the established timeframes
June 2011 to October 2011, STS Consulting
Services, LLC
Office Manager / Scheduler –
(Chesapeake Energy)
- Create and maintain Integrated
Master Schedule on P6 for Auburn Compressor Station
- Provide management with 30 day
look ahead
- Assist in guidance to
establishing Work Breakdown Structure
·
Provide resource loaded schedules in various views and
reports
- Provide updated meeting minutes
- Assist Contractors with
Microsoft Project and P3 schedule preparation for integration into
Master project schedule
June 2009 to November 2010, Lockheed Martin
East Point, GA
Sr. Scheduler – (FAA
support)
- Create and maintain Integrated
Master Schedule (P6) with analysis and reporting of airport related
projects for the New York Metro Area. Congress ordered an internal
review of all initiatives to reduce delays experienced within the New
York area. Redefinition of National Air Space, Airport projects
and the initiatives combine to create the Integrated Master schedule
(IMS)
- Provide management with 60 to
90 day look ahead
- Monitor projects within the IMS
for tasks that can be performed in parallel as well as identification of
projects that are not performing within the established timeframes
- Assist in guidance to
establishing Work Breakdown structure (Airspace Redesign Efforts)
- Establish coding structure as
well as resources that will at some point migrated into FAA standard
Work Breakdown Structure (WBS)
·
Assist in Methodology creation
·
Provide resource loaded schedules in various views and
reports
·
Assisted in integration of various Airport schedules
(Microsoft Project and P3) into Master Schedule
March 2008 to March 2009, Turnaround Group
of Texas (KBR), Huffman, TX
Sr. Scheduler –
(ExxonMobil Refinery,
Baytown, TX, Motiva Refinery, Port Arthur, TX, and ConocoPhillips Refinery,
Wilmington,
CA)
- Combined contractor schedules
(Microsoft Project, P3 and P6) with Jacobs P6 schedule estimated scope
for completely integrated TA Schedule for use in planned outage at
ExxonMobil Refinery
- Develop and implement schedule
using P6 for Capital Projects using Conceptual estimate and preliminary
IFP drawings
- Overview and direction of
support schedulers in creation and maintenance of current planned
schedule against target schedule
- Provided oversight and
direction in regard to programming changes in ConocoPhillips Turnaround
Application called TeamWork and P3 scheduling application
- Provided logic driven and
resource loaded TeamWork application for export into P3 and P6 for use
in planned outage
Sept 2007 to March 2008, Nooter
Construction St. Louis, MO
Sr. Scheduler –
(BP Refinery, Toledo, OH and
ConocoPhillips, Wilmington,
CA)
- Maintain daily progress on
overall P6 and P3 schedule for the duration of the turn-around.
Provide daily reports to the field for progressing. Advising
management of craft total man-hours and projected completion dates based
on past performance and productivity. Ability to quickly identify
critical areas and areas needing extra attention
- Prepare daily graphs (S-curves,
histograms) for management to assist in the monitoring of daily
activities and budget tracking. Provide schedule analysis
consisting of productivity and earned value reporting
- Maintain Schedule with all
Field Change Orders (FCO). Reconciliation of Field Change Orders
outstanding, and/or not approved in preparation of project closeout
- Assist in closeout of
activities; including schedule, manpower reporting, graphs, and Power
Point presentations as needed
May 2007 to July 2007, Scheduling &
Estimating Tech., Inc., Johnstown, CO
Sr. Scheduler / Cost
Controller –
(CHS Refinery, Laurel,
MT)
- Maintain daily progress on
overall P3 and P5 schedule for the duration of the turn-around.
Provide daily reports to the field for progressing along with field
verification of progress
- Prepare daily graphs (S-curves,
histograms) and cost reports for management to assist in the monitoring
of daily activities and budget tracking. Provide cost and schedule
analysis consisting of productivity and earned value reporting
- Provide Leadership and
direction to contractor planners/schedulers, with respect to Client
requirements
- Maintain Extra Work
Authorization (EWA) logs and input approved EWA’s into schedule for
daily progressing and monitoring, as well as notification on issued
purchase orders
- Assist in closeout of
activities; including schedule, reporting, graphs, costs, and Power
Point presentations
- Provide current Set owner with
constructability comments/recommendations with regard to cost
application database used in tracking all project costs
- Provide leadership in reference
to Bid process; prepare Bid packages to include scope of work,
development of schedule and bidding requirements, submitted Bid review
and evaluation
- Assist in issuance of purchase
orders for contractor award. Provide advanced notice to Client
with reference to associated costs incurred against issued purchase
orders
Feb 2006 to May 2007,
Pizzagalli
Construction
Sr. Scheduler
(Intel, Ft. Collins, CO and
Yellow River Waste Water Reclamation Facility, Lilburn,
GA)
- Provide weekly schedule and
updates of master schedule; including all engineering and design
functions adhering to a strict Intel format
- Provide analysis of critical
path and recommended alternatives for recovery
- Maintain daily progress on
overall schedule for the duration of the project. Provide daily
reports to the field for progressing. Provide daily subcontractor field
verification of progress. Work hand in hand with contractors,
superintendents, and project management to achieve maximum productivity
and reduced lost time
- Provide fragnet schedules in
critical areas showing unacceptable productivity or negative float
issues
- Provide assistance with
critical long lead equipment submittal, procurement, and delivery process
- Provided P5.1e/c schedule for
Yellow River Waste Water Reclamation Facility; including detailed
engineering, and design functions
Feb 2002 to Feb 2006, Scheduling &
Estimating Tech., Inc., Johnstown, CO
Project Controls – Sr.
Scheduler & Cost Controller
(Valero, Suncor,
ConocoPhillips, CHS and Flying J
Refineries)
- Maintain daily progress on
overall P3 schedule for the duration of the turn-around. Provide
daily reports to the field for progressing along with field verification
of progress
- Implementation using first
version of P5 e/c for tracking of cost and schedule for Suncor
Turnaround. (Difficulty was experienced with this early version)
- Prepare daily graphs (S-curves,
histograms) and cost reports for management to assist in the monitoring
of daily activities and budget tracking. Provide cost and schedule
analysis consisting of productivity and earned value reporting
- Provide Leadership and
direction to contractor planners/schedulers, with respect to Client
requirements
- Maintain Extra Work
Authorization (EWA) logs and input approved EWA’s into schedule for
daily progressing and monitoring, as well as notification on issued
purchase orders
- Assist in closeout of
activities; including schedule, reporting, graphs, costs, and Power
Point presentations
- Provide current Set owner with
constructability comments/recommendations with regard to cost
application database used in tracking all project costs
- Provide leadership in reference
to Bid process; prepare Bid packages to include scope of work,
development of schedule and bidding requirements, submitted Bid review
and evaluation
- Assist in issuance of purchase
orders for contractor award. Provide advanced notice to Client
with reference to associated costs incurred against issued purchase
orders
June 2001 to Feb 2002, J.C. Brooks Inc.,
Arvada, CO
Project Coordinator /
Scheduler
- Assist in scope development and
tracking associated schedule and costs
- Provide field support services
including but not limited to Submittal, Transmittal, and Requests for
Information, and Change Orders
- Assist in Bidding Process
- Prepare and Submit Final
Operation and Maintenance Manuals
Oct 2000 to June 2001,
James R. Howell Construction, and Co.,
Denver, CO
Project Administrator
- Assist in updating and tracking
of master schedule (Microsoft Project); including engineering and design
through constructability. Providing earned value reporting,
current versus target plan with variance analysis
- Resource loading for projected
payment requirements and assist in tracking and reporting of resources
and long lead procurement issues
- Provide field support services
including but not limited to Submittal, Transmittal, and Requests for
Information, and Change Orders
- Tracking and implementation for
Methods of Procedure (Qwest).
June 1999 to Oct 2000, Facility and Plant
Services, (Fluor Daniel Co.,) Boulder, CO
Project Controls
- Provide overall P3 master scheduling, at the IBM
facility located in Boulder
- Maintained master schedule for earned value
reporting, variance analysis and corporate financial analysis
- Status projects in an Approach database, invoice
preparation, and assist in monthly manager cost reporting and profit
analysis
- Track changes of scope (purchase orders issued),
and notify project managers of modifications needed before the expected
date of completion
- Assisted in the set-up of the Document Control
Department
Aug
1997 to Sept 1998, Project Controls Associates, Inc., Boulder, CO
Project Controls Consultant
- Provide consultation in the
evaluation, assessment, design, development, and implementation of
project management and controls practices in the area of environmental
restoration and waste management for Kaiser-Hill Company at the U. S.
Department of Energy’s Rocky Flats Environmental Technology Site
Feb
1993 to Aug 1997, Parsons Engineering Science, Inc., Denver, CO
Project Controls
Schedule/Cost
- Responsibilities include initial setup of the
work breakdown structure
- Provide assistance in the preparation of
proposals submitted for Request for Proposals includes schedule,
equipment, materials, and labor estimates
- Prepared budgets from original estimates for
input into accounting system
- Calculated budgeted cost of work performed (BCWP)
and budgeted cost of work scheduled (BCWS) for use in monthly reports to
the client. Provided cost and budget variance analysis
- Tracked percentage complete by WBS on lump sum
contracts.
- Provided fully resource loaded P3 schedules for
use in Corporate financial and profit analysis
Dec
1988- Feb 1993, J. A. Jones Construction Services Company, Golden, CO,
(U. S. Department of
Energy Rocky Flats Environmental Technology Site)
Cost Statistical Analyst
- Finalized and resource loaded the project schedule
per the original proposal.
- Maintained the target schedule in relation to the
forecast schedule, while adding additional scopes of work to the target
to indicate cost and schedule impacts.
- Calculated BCWS and BCWP used on monthly reports.
- Acted as liaison with the client in relation to
schedule, cost, and productivity issues.
- Analyzed and projected craft requirements to
match workloads and available funding.
- Supervised and implemented a strict tracking
system for change orders, field directives, and records of decision.
- Provided Monthly forecasting and trend analysis.
Education
2000-2001
Front Range Community College Westminster, CO
- Construction Materials,
Methods, and Technologies
1990–1992
Regis College, Denver, CO
- Various Mathematical and
English courses
1989-1990
Front Range Community College, Westminster, CO
- Various Accounting and Finance
courses
Additional Information
·
“Q” Clearance
·
Twenty years experience using Primavera P3 and five
years experience using and implementing newest versions of Primavera P5.1 e/c
database applications. Estimating applications used include
Timberline
·
Ability to read and understand most Blue Line Prints
- Extensive knowledge of General Construction,
Refinery, and Information Technology construction